What Changed in the 9th Edition (2026) Florida Building Code
Updated: 7 days ago
The 8th Edition (2023) Florida Building Code is the code in effect today. The Florida Building Commission lists its effective date as December 31, 2023. The next triennial update, the 9th Edition (2026), takes effect December 31, 2026, according to the Commission's 9th Edition development workplan and its updated Commission milestones document. The workplan cites Section 553.73(7)(e), Florida Statutes, which says a code update takes effect no sooner than six months after the updated code is published.
The Commission has posted Analysis of Changes documents for each volume on its code resources page. This summary uses those documents and the DBPR energy overview. Each analysis says it does not replace or interpret the code, and that it should be read alongside the code books.
How the 9th Edition was built
The approach matches the last cycle. The 8th Edition (2023) is the base code. The Commission then reviewed the 2024 International Codes (IBC, IRC, IEBC, IMC, IPC, IFGC, and IECC) and adopted only some of their changes, and it added Florida-specific amendments. The Building analysis says directly that not all 2024 IBC changes were brought into the Florida code. Each analysis marks the changes the Commission considers most significant in yellow. Most of the items below come from those flagged rows.
Permits and administration
The Building analysis lists several changes to Chapter 1:
A new exception lets non-structural alternative materials, designs, and methods show compliance through the ICC Performance Code (104.11). It does not cover alternative structural materials or designs.
Work exempt from permit (105.2) now includes accessibility renovations to existing one- and two-family dwellings. Examples are ramps with a rise of 48 inches or less, widened interior door openings, grab bars, and fixtures.
Item 4 of Issuance of permits (105.3.1.2) raises its dollar threshold from $5,000 to $15,000. In the 8th Edition text shown in the Commission's 2025 Supplement 7, that item covers specialized mechanical, electrical, or plumbing documents for systems such as medical gas, oxygen, and fire detection and alarm.
The building official may require construction documents in digital form (107.1).
Commercial plan review criteria now include base flood elevations, proposed lowest floor elevations, and dry floodproofing certification on a FEMA Dry Floodproofing Certificate or equivalent (107.3.5). The one- and two-family criteria also add base flood and proposed lowest floor elevations.
Flood inspections now require a "FEMA Elevation Certificate or equivalent" (110.3). At final inspection, an as-built FEMA Dry Floodproofing Certificate is also required where it applies.
Structural loads and wind
The 8th Edition already moved Florida to ASCE 7-22. We covered that in What ASCE 7-22 Changed for Wind Loads in the 8th Edition Florida Building Code. The 9th Edition Building analysis does not describe another change to the ASCE 7 edition. Its Chapter 35 (Referenced Standards) entry reads "No changes addressed." The wind and load items it does list are narrower:
The Vult definition now says the Section 1609.3 wind speeds are equivalent to the basic wind speeds in ASCE 7 Section 26.5.1. The Residential code adds matching Vult and Vasd definitions.
"Garage doors" and "rolling doors" become "vehicle access doors." The tabulated door pressures in Table 1609.7(1) and the residential Table R301.2(4) were revised slightly to correlate with ASCE 7-22, and their ASD wind speed references were removed. The table notes now state more clearly when the simplified pressures may be used.
The separate ASTM E1996 application section was deleted in both the Building and Residential codes.
Fences may no longer be designed with the old 75 mph fastest-mile allowance (1616.2.1).
In Table 1604.5, Risk Category IV now includes public utility facilities for power generation, potable water treatment, or wastewater treatment, along with Group I-3 occupancies other than Condition I. Ground-mounted PV panel systems are assigned to Risk Category I.
Crane loads now point to ASCE 7 Section 4.9 instead of using code-specific crane provisions.
New Section 3103.5 sets structural loads for temporary structures, including wind reduction factors based on Risk Category and service life, flood loads, foundations, and inspections.
Chapter 22 was reorganized to align with the 2024 IBC. A new Section 2210, with a new definition, sets design requirements for metal building systems.
Chapter 19 adds provisions for structural and non-structural slabs-on-ground (1907).
Retaining walls get new guard requirements (1807.2.5). In general, a guard is required where a walking surface within 36 inches of the open side is more than 30 inches above the grade below. Guards are not required at walls that are not accessible to the public.
Aluminum screen enclosure members with spline grooves must be 6005-T5 alloy or better, and the supplier has to document the alloy (2002.1.1 and 2003.1.1).
On the residential side, design pressures for soffits on the underside of elevated buildings must now be determined in accordance with ASCE 7 (R703.1.2.1).
Fasteners and connectors near saltwater
This is one of the flagged changes that will reach the most coastal projects. New Section 1711 in the Building code, and a matching section in the Residential code, set corrosion-resistance requirements for fasteners and metal connectors or plates within 3,000 feet of a saltwater coastline. The required level comes from a table based on distance from the coastline and an exposure condition that describes how much salt-laden air the location receives. The options are stainless steel, enhanced galvanizing, and standard galvanizing. Fasteners and connectors fully embedded in concrete or mortar are exempt. Roofing nails, screws, and clips, cold-formed steel, and residential floor, wall, and roof framing all point back to these requirements.
Flood
Exterior equipment and appliances damaged by flood and replaced outside a substantial improvement or repair of substantial damage must be elevated to at least the first-floor height above grade or 4 feet above grade, whichever is higher. Nonresidential buildings may use a dry floodproofed enclosure. The Existing Building (503.2, 701.3), Mechanical (301.16), and Residential (R322.1.6) analyses all flag this change.
Pool, spa, and water-feature equipment no longer has to be elevated "to the extent practical." It must be anchored against flotation and flood forces (1612.4.2 and R322.1.6).
Dry floodproofing measures must be tested (1612.4.3). Passive systems use ANSI/FM 2510, TAS 204, or another approved standard. Active systems use ANSI/FM 2510 or another approved standard. A new HVHZ protocol, TAS 204, covers passive in-place systems in A-Zones. It does not cover V-Zones or Coastal A-Zones.
New Section 1612.4.4 covers structures other than buildings, such as pole barns, gazebos, platforms, and boat shelters.
Breakaway wall provisions add strength-design-level loads, and the FEMA TB-11 under-floor-space exception was deleted (1805.1.2.1 and R408.7).
Roofing, windows, and doors
Hip and ridge asphalt shingles must be tested to UL 2375 modified to 110 mph and labeled. The alternative is a prescriptive attachment with 1-inch spots of roof cement in addition to the manufacturer's fasteners. The change appears in the Building code (1507.2.7.2), the HVHZ provisions (1518.7.4), and the Residential code (R905.2.6.2).
Metal hip and ridge covers must be uplift-tested to ANSI/MCA FTS-1.
Drip edge is now addressed across roof covering types. Asphalt shingle drip edge must be fastened at 4 inches on center for any wind speed. New drip edge sections cover tile, metal panels, metal shingles, slate, wood, and PV shingles on slopes of 2:12 and greater.
Underlayment must lap hips and ridges at least 6 inches unless ventilation openings are provided. Tile underlayment uplift resistance must meet ASCE 7 component and cladding loads (1518.8.8).
In existing buildings, a recover may remove only the upper roof covering if the substrate is adequate (706.3). New sections cover what may go over an existing self-adhering underlayment during reroofing (706.7.3).
Doors relying on the overhang exception to water-intrusion testing now need a Limited Water (LW) rating. New figures show how far the overhang has to extend (1709.5.1 and R609.3). The Commission's 2026 Product Approval significant changes summary also lists these items. For background on approvals, see our Florida Product Approval guide.
Other Building and Residential items
The allowable number of stories for Group S-1 in Type IIB and IIIB construction increases from 3 to 4 (Table 504.4).
A new Appendix P covers sleeping lofts.
Swimming pool perimeter bonding keeps Florida's single-wire method through a new exception to the NFPA 70 copper or steel grid. The analysis notes that the single-wire method has been in place in Florida for 20 years.
Residential energy storage systems in garages that are subject to vehicle impact need protection, such as bollards or wheel barriers (R328.8).
Existing buildings and milestone inspections
The Existing Building analysis lists "No changes" for Chapter 18, Minimum Requirements for the Mandatory Milestone Inspections. Milestone inspections remain an 8th Edition program carried forward. The flagged Existing Building changes are the flood equipment rule above, a requirement that repairs to existing electrical wiring and equipment comply with NFPA 70, and a new path, with documentation, for removing nonrequired automatic sprinkler systems (1012.2.1.1).
Energy conservation
DBPR's 2026 Energy Code Changes Overview summarizes the most significant changes.
Residential:
Performance (R405) compliance is about 10 percent more stringent. The maximum total e-Ratio drops from 0.95 to 0.85.
The duct-testing exception for R405 compliance is removed.
The maximum proposed-design fenestration SHGC for R405 drops from 0.50 to 0.40. The existing exception for overhangs of 4 feet or more stays.
Prescriptive compliance now requires additional efficiency credits under new Section R407: at least 10 credits from at least two measures, plus 5 more for dwelling units over 5,000 square feet.
The REScheck envelope alternative is removed.
Skylight U-factor and SHGC limits are tightened.
Mechanical ventilation flow-rate testing is new, along with a new test report form.
Cooling equipment sizing has three options that verify latent capacity.
A prescriptive exception allows R-20 unvented attics when listed conditions are met. This first appeared as a mid-cycle 8th Edition change.
For prescriptive additions, the Climate Zone 2 prohibition on electric resistance as the primary space heating system now extends to the new heating and cooling systems.
Commercial:
Air leakage limits tighten from 0.40 to 0.35 cfm/ft² at 75 Pa, with new testing and reporting for dwelling and sleeping units.
The fixed 85 percent performance threshold is replaced by an equation-based percentage.
Minimum HVAC efficiencies are higher, including for VRF systems.
Lighting power allowances are lower.
New humidity-control, boiler, and kitchen exhaust controls apply. Demand control kitchen ventilation is required for Type I hood systems over 5,000 cfm.
Electrical equipment in data centers and computer rooms must comply with ASHRAE 90.4.
Mechanical, plumbing, and fuel gas
Mechanical: Chapter 11 was updated for A2L refrigerants to correlate with ASHRAE 15. High-probability direct systems for human comfort must use Group A1 or A2L refrigerants. New provisions cover equipment listing and changing or mixing refrigerant safety classes. The Residential code adds parallel A2L sections (M1411). Rooftop access ladders were updated to OSHA requirements, and a clear landing is now required on the exit side of a roof hatch. The ventilation-rate table adds many new occupancy categories.
Plumbing: Maximum showerhead flow drops from 2.5 to 2.0 gpm, and showerheads must meet the high-efficiency requirements of ASME A112.18.1/CSA B125.1 (Table 604.4). New provisions protect piping from expansive soils (305.8). Vacuum testing of drain and vent piping is allowed (312.11). Cure-in-place sewer rehabilitation must follow ASTM F1216 or F1743. The minimum fixture table was reorganized.
Fuel gas: The rooftop ladder and landing changes also appear in the Fuel Gas code. Other changes include clarifications on arc-resistant CSST bonding and conduit terminations.
Supplements
The Commission approved a 2026 Supplement 1 to the 9th Edition on October 13, 2026, and posted it on its resources page. Among other items, it adds a provision on expiration of single-family dwelling permits that refers to the effective date of the next code edition. Check the current supplements before relying on the base 9th Edition text.
Our take
For the next several weeks, the main question on any Florida permit is which edition applies. Before December 31, 2026, ask the building department which edition will govern your application, and do not mix 8th and 9th Edition notes in one set of drawings.
On wind, the 9th Edition is not a second ASCE 7-22 overhaul. The map and roof-zone changes came with the 8th Edition, and our earlier article covers them. What changes in 2026 is mostly detail: vehicle access door tables, a cleaner Vult definition, the loss of the old 75 mph fence allowance, and soffits under elevated houses now designed to ASCE 7. Those details still show up on plans and at inspection.
The saltwater fastener rule is the change I expect to touch the most of our coastal work, from Gulf Breeze houses to sign and canopy anchorage near the water. Within 3,000 feet of a saltwater coastline, the connector and fastener schedule needs to reflect the new table. That should be decided in design, not at the framing inspection.
For house elevation and work in flood zones, the paperwork is tighter. Plans need proposed lowest floor elevations, inspections call for FEMA certificates by name, and replacement exterior equipment has to go up to the first-floor height or 4 feet. Owners should hear about that before the HVAC contractor shows up.
The new metal building systems section and the slab-on-ground provisions are worth reading on the next pre-engineered building we coordinate. The analysis does not change the basic point from our metal building foundations article: get current manufacturer reactions before the foundation is designed.
Milestone inspections did not change in the base 9th Edition text. They remain an existing-building program that runs on its own schedule.
On energy, residential performance compliance is about 10 percent harder (an e-Ratio of 0.85), and prescriptive compliance now needs efficiency credits. Mechanical and energy decisions should happen early in design, not at permit.
Finally, local amendments and the building official still control how the code is applied in each jurisdiction. When the analysis and the code book disagree, the code book governs.