For anyone designing on the Gulf Coast, two parts of the 9th Edition (2026) Florida Building Code matter more than anything else: a brand-new section on corrosion near saltwater, and tighter flood documentation. Both apply to permit applications filed on or after December 31, 2026.

Fasteners and connectors near saltwater (Section 1711 and R332)

New Section 1711 in the Building volume, and a matching section in the Residential volume, set corrosion requirements for fasteners, connectors and metal plates within 3,000 feet of a saltwater coastline. Hardware fully embedded in concrete or mortar is exempt. What you need depends on distance and exposure:

  • Within 300 feet, exterior or open exposure: stainless steel fasteners and connectors (Type 316 for connectors).

  • 300 to 3,000 feet, exterior exposure: galvanized fasteners with enhanced galvanized connectors.

  • Vented, unconditioned interior spaces such as attics and crawlspaces: galvanized fasteners with enhanced galvanized connectors.

  • Unvented, unconditioned interior spaces: galvanized fasteners with standard G90 galvanized connectors.

  • Fastener coatings must be compatible with the connector they go into, to prevent galvanic corrosion.

This changes hardware schedules, product submittals and purchasing for a lot of coastal work. House lifts, elevated decks, piling-supported homes and metal buildings near the water are the obvious ones. The Residential volume carries the same rule into its foundation, floor, wall, roof and roof-covering chapters.

Flood documentation

  • Construction documents must show base flood elevations and the proposed lowest floor elevation, for both commercial and residential work (107.3.5).

  • Commercial projects using dry floodproofing need a dry floodproofing certificate, and an as-built certificate at final inspection.

  • Foundation and final inspections call for a FEMA Elevation Certificate or equivalent (110.3, R322.1.10), and the building official has to keep those records.

  • New flood provisions cover structures other than buildings, such as boat shelters and gazebos (1612.4.4), plus new dry floodproofing test requirements.

Equipment, pools and breakaway walls

  • When damaged exterior equipment is replaced in a flood hazard area, it has to go at the higher of the first floor height or 4 feet above grade. This applies even when the work is not a substantial improvement (R322.1.6, EB 503.2 and 701.3).

  • Pool equipment in flood zones must now be anchored instead of elevated (1612.4.2), and the old residential pool equipment exception is gone.

  • Breakaway walls get strength-design load provisions (1612.5, R322.3.5).

  • The FEMA TB-11 under-floor exception is deleted (1805.1.2.1, R408.7).

Sources

FBC 2026 Significant Changes and Analysis of Changes, Building (Florida Building Commission). This is a plain-language summary of the Florida Building Commission's published Analysis of Changes, not the code itself. Always check the adopted code text and your local building department before you design or permit. Questions about how a change affects your project? Call Voelkel Engineering at 850-288-0333.

 
 
 

Recent Posts

See All

Comments


850-288-0333

362 Gulf Breeze Pkwy Box 174  |  Gulf Breeze, FL 32561  |  Privacy Policy

bottom of page