<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[Voelkel Engineering LLC]]></title><description><![CDATA[Voelkel Engineering LLC in Gulf Breeze, FL: sealed structural, wind load, civil and MEP engineering for homes, businesses and signs in Florida, Alabama and Texas. Request an estimate online.]]></description><link>https://www.voelkelengineering.com/blog</link><generator>RSS for Node</generator><lastBuildDate>Fri, 27 Nov 2026 11:17:35 GMT</lastBuildDate><atom:link href="https://www.voelkelengineering.com/blog-feed.xml" rel="self" type="application/rss+xml"/><item><title><![CDATA[Channel Letter and Wall Sign Engineering for Permits in FL, AL and TX]]></title><description><![CDATA[Channel letters and wall signs look simple next to a pylon or monument sign, but many building departments in Florida, Alabama and Texas still want sealed engineering before they issue the permit. The question is rarely the letters themselves. It is how the sign is attached to the wall, and whether that wall can carry the load. Voelkel Engineering LLC provides sealed wall sign and channel letter engineering for sign shops, working remotely from your shop drawing, photos and the site address....]]></description><link>https://www.voelkelengineering.com/post/channel-letter-wall-sign-engineering-florida-alabama-texas-attachment-wind-load</link><guid isPermaLink="false">6b06f68f049af076c4571682</guid><pubDate>Wed, 25 Nov 2026 14:54:07 GMT</pubDate><dc:creator>Christian Voelkel</dc:creator></item><item><title><![CDATA[2026 Florida Building Code: What It Means for Engineering Firms and Engineering Plans]]></title><description><![CDATA[What the 9th Edition (2026) Florida Building Code changes for engineering firms: which edition governs your plans, what reviewers will expect on the drawings, coastal hardware, and a checklist.]]></description><link>https://www.voelkelengineering.com/post/2026-florida-building-code-engineering-firms-engineering-plans</link><guid isPermaLink="false">6afe6386cf410d6d41cc651a</guid><pubDate>Thu, 19 Nov 2026 02:48:38 GMT</pubDate><dc:creator>Christian Voelkel</dc:creator></item><item><title><![CDATA[The 2026 Florida Building Code (9th Edition): What's Changing and When]]></title><description><![CDATA[The 9th Edition (2026) Florida Building Code takes effect December 31, 2026. Which projects it applies to, how vesting works, and a guide to the changes by subject.]]></description><link>https://www.voelkelengineering.com/post/2026-florida-building-code-9th-edition-what-is-changing</link><guid isPermaLink="false">6afe16c5c0955bf512880f94</guid><pubDate>Wed, 18 Nov 2026 21:21:09 GMT</pubDate><dc:creator>Christian Voelkel</dc:creator></item><item><title><![CDATA[2026 Florida Building Code: Existing Buildings, Repairs and Permitting Changes]]></title><description><![CDATA[Repairs, alterations, change of occupancy, permit thresholds, digital documents and new site safety rules in the 9th Edition (2026) Florida Building Code.]]></description><link>https://www.voelkelengineering.com/post/2026-florida-building-code-existing-buildings-permitting-changes</link><guid isPermaLink="false">6afe16a9e02b38760caf43e5</guid><pubDate>Wed, 18 Nov 2026 21:20:41 GMT</pubDate><dc:creator>Christian Voelkel</dc:creator></item><item><title><![CDATA[2026 Florida Energy Code Changes for Homes and Commercial Buildings]]></title><description><![CDATA[A tighter e-Ratio, lower SHGC, required efficiency credits, ventilation testing and new commercial air leakage and HVAC limits in the 9th Edition (2026) Florida energy code.]]></description><link>https://www.voelkelengineering.com/post/2026-florida-energy-code-changes-homes-commercial</link><guid isPermaLink="false">6afe168e46ecef7e2cbab9e0</guid><pubDate>Wed, 18 Nov 2026 21:20:14 GMT</pubDate><dc:creator>Christian Voelkel</dc:creator></item><item><title><![CDATA[2026 Florida Residential Code: What Changes for New Homes and Additions]]></title><description><![CDATA[Stairs, smoke and CO alarms, garage separation, EV charging, batteries, dryer makeup air and A2L refrigerants in the 9th Edition (2026) Florida Building Code, Residential.]]></description><link>https://www.voelkelengineering.com/post/2026-florida-residential-code-changes-homes</link><guid isPermaLink="false">6afe1676e02b38760caf4379</guid><pubDate>Wed, 18 Nov 2026 21:19:50 GMT</pubDate><dc:creator>Christian Voelkel</dc:creator></item><item><title><![CDATA[2026 Florida Building Code: Roofing, Windows and Building Envelope Changes]]></title><description><![CDATA[Hip and ridge wind testing, drip edge everywhere, new reroofing exceptions, and window and door labeling under the 9th Edition (2026) Florida Building Code.]]></description><link>https://www.voelkelengineering.com/post/2026-florida-building-code-roofing-envelope-changes</link><guid isPermaLink="false">6afe165846ecef7e2cbab96a</guid><pubDate>Wed, 18 Nov 2026 21:19:20 GMT</pubDate><dc:creator>Christian Voelkel</dc:creator></item><item><title><![CDATA[2026 Florida Building Code: New Saltwater Corrosion and Flood Rules]]></title><description><![CDATA[The 9th Edition (2026) FBC adds corrosion rules for fasteners and connectors within 3,000 feet of saltwater and tightens flood documentation and equipment elevation.]]></description><link>https://www.voelkelengineering.com/post/2026-florida-building-code-coastal-corrosion-flood-changes</link><guid isPermaLink="false">6afe163ce02b38760caf430b</guid><pubDate>Wed, 18 Nov 2026 21:18:52 GMT</pubDate><dc:creator>Christian Voelkel</dc:creator></item><item><title><![CDATA[2026 Florida Building Code: Structural Design and Load Changes]]></title><description><![CDATA[What the 9th Edition (2026) Florida Building Code changes for structural design: risk categories, live loads, foundations, wood framing, steel, glass and temporary structures.]]></description><link>https://www.voelkelengineering.com/post/2026-florida-building-code-structural-design-changes</link><guid isPermaLink="false">6afe161c46ecef7e2cbab8d9</guid><pubDate>Wed, 18 Nov 2026 21:18:20 GMT</pubDate><dc:creator>Christian Voelkel</dc:creator></item><item><title><![CDATA[The FEMA 50% Rule: When a Home Must Be Elevated in FL, AL and TX]]></title><description><![CDATA[If you lift houses in Florida, Alabama or Texas, many of your best leads start with the same letter from the building department: the home is "substantially damaged" or the planned remodel is a "substantial improvement," so it has to be brought up to current flood rules. That is the FEMA 50% rule, and it is one of the most common reasons a homeowner calls a house lifter. Voelkel Engineering LLC designs the elevation foundations and prepares sealed, permit-ready elevation plans for those jobs,...]]></description><link>https://www.voelkelengineering.com/post/fema-50-percent-rule-substantial-damage-house-elevation-florida-alabama-texas</link><guid isPermaLink="false">6afdbb5346ecef7e2cba0b94</guid><pubDate>Wed, 18 Nov 2026 14:50:59 GMT</pubDate><dc:creator>Christian Voelkel</dc:creator></item><item><title><![CDATA[Do You Need a Soil Report for a Metal Building Foundation? PEMB Geotechnical Guide for Florida, Alabama and Texas]]></title><description><![CDATA[When a metal building foundation needs a geotechnical report, when presumptive soil values are enough, and what to send for a sealed PEMB foundation design in FL, AL and TX.]]></description><link>https://www.voelkelengineering.com/post/metal-building-foundation-soil-report-geotechnical-pemb-florida-alabama-texas</link><guid isPermaLink="false">6af4864fbdbd940e35946e9b</guid><pubDate>Wed, 11 Nov 2026 15:14:23 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/388766_9df140ea35e24686afe6287df3729abf~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Christian Voelkel</dc:creator></item><item><title><![CDATA[Wind Load Engineering in Florida, Alabama and Texas]]></title><description><![CDATA[Sealed ASCE 7 wind load calculations and design for signs, canopies, metal buildings, elevated homes and product approvals in Florida, Alabama and Texas.]]></description><link>https://www.voelkelengineering.com/post/wind-load-engineering-florida-alabama-texas</link><guid isPermaLink="false">6af289eac2ee3e3a7f326b91</guid><pubDate>Tue, 10 Nov 2026 03:05:14 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/388766_11a15e6f87664b01a47278053f167c40~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Christian Voelkel</dc:creator></item><item><title><![CDATA[What Changed in the 9th Edition (2026) Florida Building Code]]></title><description><![CDATA[The 9th Edition (2026) Florida Building Code takes effect December 31, 2026. Using the Florida Building Commission's Analysis of Changes and DBPR's energy overview, we summarize what is new: saltwater fastener rules, flood equipment and floodproofing testing, hip and ridge shingle wind testing, a new metal building systems section, stricter energy compliance, A2L refrigerants, and what did not change for milestone inspections.]]></description><link>https://www.voelkelengineering.com/post/what-changed-9th-edition-2026-florida-building-code</link><guid isPermaLink="false">6af27e0af91257eb61dbf4fe</guid><pubDate>Tue, 10 Nov 2026 02:14:34 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/388766_8f9ffb8f2c97464dae0a150ed4020639~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Christian Voelkel</dc:creator></item><item><title><![CDATA[Metal Building Foundations: Why Coordination and Uplift Drive the Design]]></title><description><![CDATA[Metal building foundations are often governed by wind uplift and frame thrust, not the weight of the building. Coordination between the manufacturer’s drawings and the foundation design is what keeps permits and pours on schedule.]]></description><link>https://www.voelkelengineering.com/post/metal-building-foundations-coordination-and-uplift</link><guid isPermaLink="false">6af2791d5f9bb6832e67b145</guid><pubDate>Tue, 10 Nov 2026 01:53:33 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/388766_330f350cdaaf4b25ba411a2a786ecb93~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Christian Voelkel</dc:creator></item><item><title><![CDATA[What ASCE 7-22 Changed for Wind Loads in the 8th Edition Florida Building Code]]></title><description><![CDATA[The Florida Building Commission’s June 2024 fact sheet explains how the 8th Edition (2023) Florida Building Code updated its wind criteria to match ASCE 7-22, including panhandle speed changes, roof pressures, elevated buildings, and tornado loads.]]></description><link>https://www.voelkelengineering.com/post/what-asce-7-22-changed-for-wind-loads-8th-edition-fbc</link><guid isPermaLink="false">6af2791cc2ee3e3a7f3244cf</guid><pubDate>Tue, 10 Nov 2026 01:53:32 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/388766_eb25b92d5056441694e3b5f96ad78f34~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Christian Voelkel</dc:creator></item><item><title><![CDATA[Signs]]></title><description><![CDATA[Engineering for monument, pylon, billboard and wall signs.]]></description><link>https://www.voelkelengineering.com/post/sign-design</link><guid isPermaLink="false">6af22a3e207895489943f6dc</guid><pubDate>Mon, 09 Nov 2026 20:17:02 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/388766_eebeb5a714424fd9a9a979295b73d7f0~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Christian Voelkel</dc:creator></item><item><title><![CDATA[Plumbing Design]]></title><description><![CDATA[Water supply and drainage systems planned around the fixtures and service needs of your building.]]></description><link>https://www.voelkelengineering.com/post/plumbing-engineering-design</link><guid isPermaLink="false">6af0e8d1c2ee3e3a7f2f27ed</guid><pubDate>Sun, 08 Nov 2026 21:26:24 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/388766_a2f0c1a84d39486bb3862df040921e1a~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Christian Voelkel</dc:creator></item><item><title><![CDATA[Electrical Design]]></title><description><![CDATA[Power and lighting plans coordinated with your layout, equipment and building systems.]]></description><link>https://www.voelkelengineering.com/post/electrical-engineering-design</link><guid isPermaLink="false">6af0e8d3c2ee3e3a7f2f27f2</guid><pubDate>Sun, 08 Nov 2026 21:26:24 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/388766_c186983bfd754ac9875a3eccb35c6dd2~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Christian Voelkel</dc:creator></item><item><title><![CDATA[Mechanical Design]]></title><description><![CDATA[Heating, cooling and ventilation design suited to the building and the way its spaces are used.]]></description><link>https://www.voelkelengineering.com/post/mechanical-engineering-design</link><guid isPermaLink="false">6af0e8d1c2ee3e3a7f2f27ea</guid><pubDate>Sun, 08 Nov 2026 21:26:24 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/388766_0e546267b22b46c9a5a669ab45f8eea0~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Christian Voelkel</dc:creator></item><item><title><![CDATA[Metal Building Foundations]]></title><description><![CDATA[Concrete foundations and anchorage coordinated with your metal building and site conditions.]]></description><link>https://www.voelkelengineering.com/post/metal-building-foundation-design</link><guid isPermaLink="false">6af0e8d1c2ee3e3a7f2f27e9</guid><pubDate>Sun, 08 Nov 2026 21:26:24 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/388766_cdd169ea2a794eee953129057da8d9db~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Christian Voelkel</dc:creator></item></channel></rss>